Showing posts with label QAL. Show all posts
Showing posts with label QAL. Show all posts

27 March 2014

No Tears in Science

I finally finished my Texas Tear Drops QAL from last year. Woo hoo!

Here it is in my lab, being all science-y ^_^

The finished size is slightly smaller than the pattern size of 70x70" because I put a thinner border on the outside. I did bind with the same material as the border (those cute molecules), which is totally new for me. I usually like dark bindings to be a frame or whatever, but in this case, I think the fading edge thing is pretty cool.

Here's a close-up of the binding, backing, and quilting.

For the quilting, I did an all over square stipple. Most people in the QAL seemed to do something that only went around the drops (which is what I did for the small version). Whatever, I like to be different. I used the same variegated blue from the appliqué on the front and black for the back. You can't see the quilting on the back at all except for where it crosses the little filler strip of not black. The last bit of quilting is a loopy bit in the thin blue border.

And here it is in its new home on the bed

Linking up to the ALYoF March Finishes party. Here's a link to the original ALYoF March goal post.

05 March 2014

WIP Wednesday - March ALYoF Goal

For March, I want to finish my Texas Tear Drops QAL quilt, the full size version. During the actual QAL I made a mini version of the quilt as a gift for my host in Korea (she totally loved it, by the way). By the end of the QAL I had all my full size blocks ironed and had settled on a layout, but they weren't appliquéd.

quilting in progress

Since late August/early September this quilt has been sitting in a bag waiting to be basted and finished. I even pre-made the binding and settled on a quilting motif (square stippling). Now that it's been sitting in a closet for 6 months I figured it is time to resurrect this quilt and finish it. Luckily, I am already making solid progress and will hopefully have another successful month of quilting.

I'm fortunate to have plenty of feline support on this endeavor...

Good luck to everyone else on your Lovely Finishes!


and WIPs!

03 September 2013

WIP Wednesday - A Long List

This semester I am implementing a strict 'No Science on Saturday' policy for my general health and well-being. This means that I now have one day a week when I'm almost guaranteed to be able to sew! This is especially nice since I just took an 11 day vacation in Denmark with my sister and have thus been neglecting my duties both in the lab and quilting. I have a lot of things to do in both arenas, but in the interest of not boring people with science, I'll only be discussing the quilty list...

1. Texas Teardrops QAL:
-top is finished!
-backing and binding are prepped
-completely undecided on quilting and open to suggestions (please!)

binding rolls are awesome ^_^

2. Window to Seoul (100Q4Kids):
-fixed the two upside down rows and then made additional changes
-finished quilting
-in the process of attaching the binding

3. Trinity Celtic Knot (wedding quilt):
-started cutting the strips!! (the whole thing is going to be strip pieced so cutting is a cinch, I could actually see jelly rolls working really nicely for a scrappy version of this quilt)

4. Gung Mun (self-designed, Korea-inspired pattern):
-I have fabric and a plan but haven't started cutting or anything yet

5. Fly South:
-basted and waiting to be quilted (it's been in this state for a few months now...)
-made the binding!

I'm trying out scrappy binding, we'll see how it goes

Hmm, that list wasn't as long as I thought it would be. Doing 5 projects at once is totally manageable, right?


05 August 2013

Return of the QAL

I know that the Texas Teardrops QAL ended in June, but I've just started working on mine again. I finished a smaller version on the QAL schedule because it was a gift. This full size version (a.k.a. the nerdy version) had only been fused by the time I left the country.

Progress as of the end of the QAL = not much

When I got home from Korea pretty much the first thing I did was quilt (I think I had withdrawal...). So now all the teardrops are appliquéd, the blocks are trimmed, and the setting triangles and borders are all cut. Hopefully I will be able to get the top completed in the next week. I'll have to vacuum my floor first though, so I have somewhere to put it while I'm working!

If you look closely, you can notice that this WIP is sitting atop another WIP...

I ordered a backing and binding but I suspect I will be in Denmark by the time it arrives which means my QAL will be finished a minimum of 3 months behind schedule. Looks like I'm turning my first QAL into a big ol' UFO, I always do get confused with acronyms...



05 June 2013

Prepping for Korea Part 3: Texas Teardrops QAL

As I'm writing this, my present for my host is in the washer getting a rinse before I pop it in the dryer to fluff it up before I leave for Korea in the morning. And by morning I mean in like 5 hours...

The binding isn't all the way on yet but it was getting dark

I'm pretty happy with my QAL results even though I only finished one version, the one that's a present of course. The full size, square, actually following the pattern version is in the all ironed but not appliqued yet stage. Hopefully I will be able to finish it this fall when I come back. Anyway, back to the one I did finish!

I decided on pebbling for the main quilting which was an experience. I'm glad that this quilt is really small (about 40x48) because pebbling takes forever and a TON of thread.

After a quick test, I went for it!




















For the borders, I did a little loopy swirly thing with a leaf-esque pattern in the corners. I also did one echo in the center of each teardrop to keep it down. I really like how the quilting looks from the back. I also really like the fabric I found for the back, it has a little bit of gold in it.

borders and corner flower/leaf thing

A zoom in of the back

Check out the flickr group to see everyone else's super awesome (and mostly full size) teardrop quilts!

Update 12 June 2013
I finally got this quilt all wrapped up and gave it to my host on Monday. And she liked it (huge sigh of relief on my part). Turns out this is her favorite color scheme - lucky! 

Also, if anyone is wondering, the squares for the pieced border come from the scraps from cutting out the teardrops. I used the smaller size teardrop from the back of the pattern and a layer cake. I used 41 10" squares total for this quilt mostly from the neutral love collection at Connecting Threads. The inner and outer borders, binding, and backing came from my LQS (which is my way of saying I have no idea who they're by or what they're called).

08 May 2013

One Leaps Ahead and Another Falls Behind

I have made great progress recently on one of my Texas Teardrop QAL tops and absolutely no progress on the other. I thought I was going to fall behind in the appliqué stage and I kind of have but not entirely, which is a relief.

I have not yet appliquéd any of the brights on white teardrops, but I have finished appliquéing, trimming, and putting together the blocks for the neutral version.

My first appliqué!
 I also put together the pieces for the border. I'm going to put a thin solid border between the top and the pieced border and another one on the outside before the binding. I have the inner and outer border fabrics, but I haven't yet gotten backing or binding. I do have to do a little unsewing and lining up for the border but I am pretty happy with the plan. I don't know yet what I'm going to do for the quilting.

All together and pinned to the wall



Check out WIP Wednesday at Freshly Pieced

24 April 2013

Teardrops!

I have been working hard on cutting, laying out, and fusing my teardrops. And yes, I did decide to make two versions, we'll see how that goes.

Quick phone pick of the "final" layout in case
something happens before they're all fused

Ready to lay out some drops!

I actually ended up a little ahead because I started fusing before Monday's fusing post but I have a feeling that I'm about to fall behind on the appliquéing because it's nearing the end of the semester so I have lots of things to do for class as well as my research (20 page paper due Monday, yikes!).

I borrowed my roommate's bed to lay out this one because
my bed is tiny and the other one was already on my floor

The neutrals went together without too much fuss/rearranging (I actually think I didn't move any background squares and I'm pretty sure after the first layout I only switched two or three drop pieces). The brights were a very different story. I didn't photograph many of the iterations but at one point I picked up every piece and started completely over. I seriously messed with these for a week. When I got this layout I stopped and fused them before I went completely crazy. Of course now, looking at the picture again, I think the lower left corner is not quite right...

Too late, they're already fused. Science alligator hypothesizes
that all will be fine, but so far the data are inconclusive

At any rate, I have to make sure I finish the neutrals version on the QAL schedule because it is going to be a gift for my host when I go to Korea this summer. My dates aren't set yet, but I'm planning on leaving no later than June 13 which is pretty much exactly the QAL time frame. Good thing it's a long flight to Korea just in case when I'm binding last minute!


10 April 2013

QAL Progress: Making Templates

This week in my QAL is for making the teardrops and cutting them out. I have been busily tracing away. I feel like a teardrop factory or something. I taped the template to my desk and just move the roll over after I finish tracing, assembly line style.

It looks like a paper onion.

I also started cutting out the drops, but only the outermost shape. I'm waiting for tomorrow's cutting guide to do the inner pieces because I really don't want to mess them up! So far cutting these out with the little baby sized cutter has been pretty fun, though a little weird to get used to.

I kind of like the shape when they're solid, reminds me of ornaments

Other WIPs:
-Fly South - top is done, layers are basted, and I have thread and a plan for the quilting
-DNP Sampler - most of the quilting is done (I think, I haven't really been able to stick to a plan with this guy so we'll see what happens) and I sewed the binding on to the front I just need to do the hand-sewing (that's right, I put the binding on before the quilting was done: take that rules and conventions!)
-mini charm pack thing - I cut all the corresponding background squares to go with the mini charms; all of the pieces for the blocks are sorted and just waiting to be sewn

I like this whole making a list of WIPs thing, it surprisingly makes everything seem much more together/organized than it looks in my closet/all over my floor...

03 April 2013

QAL Fabric Choices and Prep

Last night I went shopping for a few things that I need to start the QAL. Apparently week 1 is for getting your stuff together so I am on track (except for getting the coordinating threads which is problematic since I have so many different colors...)

Ready. Set. Sew!

I am as yet undecided about fabric. The original quilt, as well as the suggestions, are all brights on white.

Brights are nice

But, I also think it could look really cool using neutral prints on other neutrals (solids and prints that look more or less solid).

Neutrals for the drops

If I go for neutrals I only have 17 so some of the drops would not have the outer-most ring, which I think will significantly change the look of the finished product. Maybe it will be so different that ignoring the whole "use high contrast fabrics" thing will be okay?

Most likely, I will end up doing both versions because, well, I'm all over ambitious like that.


I'm linking to WIP Wednesday at Freshly Pieced

28 March 2013

Texas Teardrops QAL!

For some unknown reason I woke up this morning and decided that I really want to do a quilt along, like right from the beginning. So now I'm going to join the Texas Teardrops Quilt Along that starts April 1. Nothing like waiting til the last minute...

It looks pretty awesome though, right?